* Obtaining electrical power connection for free in the offices of the Board
Should apply not only in the form provided. Electrical Licensing Board
Through the work of the contractor, the quality of material
Wire system must perform. Good land line (Earth), with
Triple Barrel cores (Three rear socket) only, electric tools
Are fixed.
* E-meter board, the tools themselves, modify, damage vilaivikkavo
Should not. When constructing the building, according to the high-voltage electric current rules, talvalutta
Adequate spacing between electrical wires. Electrical equipment, electrical
Link routes to nearby objects and cause of the accident.
Spam E-Matches (plug), the equipment must be used
Should not.
* 4000 watts of electrical connection at the same time as the load
Rise, single-phase (Single Phase) connection, 3-phase
(Three Phase) to change the system, the power of the Board officials
Want.
* All of the buildings, the ground floor electrical meter (m),
Electric (FUSE), etc. are fixed. Atiyilo to the stairs,
Meters to be applied to the outside of the building. E department
Permission to transfer the meter location.
* Electrical connection for any given application, it is only
Should be used. Link to home electrical store, post office, such as business
For the purpose of the use of punishment or blame aparatattukkuriya.
* E-card will be placed in the vicinity of the meter. Utility Accountant
Surveyed size after sending bills alone.
As soon as the SMS. The project is underway. Cover
Please read the information must be printed. E-card, money
Receipt of payment of the electrical connector is properly kurikkappattullata
Note that.
* E-meter charge, additional deposits will pay a penalty of the best delay.
* Failed to pay the bills, electrical connection is closed
And with a penalty fee is paid, the Board of the Faculty
Tell the officer or accountant can reconnect. M
If repair, new meter change information in writing on the Board
Must report. If not for several months until the meter
The consumer will have to pay the penalty amount.
* Rent or lease basis to residents of the home owners in addition to the fees charged for the crime.
* Electrical Utility quantity surveying to come, given the amount of electricity
Should not. If so, it's the responsibility of the Board.
Should apply not only in the form provided. Electrical Licensing Board
Through the work of the contractor, the quality of material
Wire system must perform. Good land line (Earth), with
Triple Barrel cores (Three rear socket) only, electric tools
Are fixed.
* E-meter board, the tools themselves, modify, damage vilaivikkavo
Should not. When constructing the building, according to the high-voltage electric current rules, talvalutta
Adequate spacing between electrical wires. Electrical equipment, electrical
Link routes to nearby objects and cause of the accident.
Spam E-Matches (plug), the equipment must be used
Should not.
* 4000 watts of electrical connection at the same time as the load
Rise, single-phase (Single Phase) connection, 3-phase
(Three Phase) to change the system, the power of the Board officials
Want.
* All of the buildings, the ground floor electrical meter (m),
Electric (FUSE), etc. are fixed. Atiyilo to the stairs,
Meters to be applied to the outside of the building. E department
Permission to transfer the meter location.
* Electrical connection for any given application, it is only
Should be used. Link to home electrical store, post office, such as business
For the purpose of the use of punishment or blame aparatattukkuriya.
* E-card will be placed in the vicinity of the meter. Utility Accountant
Surveyed size after sending bills alone.
As soon as the SMS. The project is underway. Cover
Please read the information must be printed. E-card, money
Receipt of payment of the electrical connector is properly kurikkappattullata
Note that.
* E-meter charge, additional deposits will pay a penalty of the best delay.
* Failed to pay the bills, electrical connection is closed
And with a penalty fee is paid, the Board of the Faculty
Tell the officer or accountant can reconnect. M
If repair, new meter change information in writing on the Board
Must report. If not for several months until the meter
The consumer will have to pay the penalty amount.
* Rent or lease basis to residents of the home owners in addition to the fees charged for the crime.
* Electrical Utility quantity surveying to come, given the amount of electricity
Should not. If so, it's the responsibility of the Board.